成品人视频ww入口,东北老富婆高潮大叫对白,99精品国产在热久久无毒不卡,一区二区三区内射美女毛片

News

Current Position: Home > News
What should I pay attention to before and after using the mold temperature machine?
announcer:
In industrial production temperature control equipment, the use of mold temperature machine is very common. It can be seen in the production of zinc alloy die casting, magnesium alloy die casting, rubber and plastic extrusion, and injection molding products. In addition to the advantages of relatively simple and convenient operation methods, most of the units are automatically operated. After only using the operation and setting the temperature, the operation method personnel do not need to re-unit, if the unit has a malfunction, there will be immediate Alarm reminder. But in addition to the old users who have already used machinery and equipment, many customers are also exposed to this equipment at the beginning. They are very concerned about how to correctly apply the mold temperature machine, and what is the correct operation process?
1. Inspection before operation of mold temperature machine
Check whether the surrounding area is clean and free of debris, check whether the switching power supply, electric heater, control board, barometer, pump, etc. are all normal; whether the valve of the water cooling pipe has been opened, and whether the water cooling supply is normal;
Check whether the oil level of the expansion tank is correct, whether the liquid level sensor, etc. are normal;
Connect to the switching power supply of the control cabinet, check whether the voltage is normal, and check whether the indicator lights and display instruments are normal.
2. Operation method of machine equipment
Operate the heat transfer oil circulation pump, after starting the pump, all normal circulation will stabilize the pressure within 0.5 hours;
Press the heating operation button and observe whether the heating is normal;
Be sure to pay attention to the condition of the barometer during the initial operation.
3. Operation method of machine equipment shutdown
All normal shutdown: gradually reduce the temperature and stop heating. When the temperature of the heat transfer oil drops below 70°C, stop the operation of the heat transfer oil circulation pump; turn off the main switching power supply and make handover statistics.
Emergency shutdown: If the emergency shutdown occurs due to an emergency, the heating tube should be quickly turned off to facilitate the natural cooling of the thermal oil and avoid overheating.
4. FAQ
During the inspection, pay attention to check whether there is leakage around the mold temperature machine. The surrounding should be equipped with sufficient oil and electrical fire fighting equipment, and it is forbidden to use water as a fire extinguishing agent.
中文字幕亚洲一区二区三区| 国产专区一线二线三线品牌东| 国产在线拍揄自揄拍免费下载| 亚洲AV无码国产剧情| 亚洲精品无码永久电影在线| 国产精品无码无需播放器| 国产自偷亚洲精品页65页| 国产拍揄自揄免费观看| 久热这里只精品99国产6-99RE视…| 无码精品国产一区二区三区免费| 极品少妇一区二区三区四区| 久久久亚洲综合久久久久87| 国产 中文 制服丝袜 另类| 日本人妻丰满熟妇久久久久久| 国产成人无码区免费内射一片色欲| 久久精品九九热无码免贵| 国产又A又黄又潮娇喘视频| 精品国产V无码大片在线看| 亚洲av成人无码网站大全| 青青草原综合久久大伊人| 免费看AV毛片一区二区三区| 一个人看的视频WWW在线观看免费| 爽爽精品dvd蜜桃成熟时电影院| 人妻美妇疯狂迎合| 国产成人精品成人a在线观看| 极品尤物被啪到呻吟喷水| 亚洲国产精品久久精品| 国产一区二区四区在线观看| 亚洲国产欧美在线看片一国产| 亚洲精品成人网站在线观看| 激情内射亚州一区二区三区爱妻| 久久人妻无码一区二区| 欧美jizzhd精品欧美| 无码喷水一区二区浪潮AV| 亚洲av永久中文无码精品| 亚洲性无码av中文字幕| 精品一区二区三区无码免费视频| 久久久久免费精品国产| 精品国产一区二区三区AV| 中文无码制服丝袜人妻AV| 青春禁区视频在线观看|