成品人视频ww入口,东北老富婆高潮大叫对白,99精品国产在热久久无毒不卡,一区二区三区内射美女毛片

News

Current Position: Home > News
What should I pay attention to before and after using the gas mold temperature machine?
announcer:

In industrial production temperature control equipment, the use of gas mold temperature machine is very common. It can be seen in the production of zinc alloy die casting, magnesium aluminum alloy die casting, rubber and plastic extrusion, and injection molding products. In addition to the advantages of relatively simple and convenient operation methods, most of the units are automatically operated. After only using the operation and setting the temperature, the operation method personnel do not need to re-unit, if the unit has a malfunction, there will be immediate Alarm reminder. But in addition to the old users who have already applied machinery and equipment, many customers are also exposed to this equipment at the beginning. They are very concerned about how to correctly apply the gas mold temperature machine, and what is the correct operation process?

 

1. Inspection before operation of gas mold temperature controller

Check whether the surrounding area is clean and free of debris, check whether the switching power supply, electric heater, control board, barometer, pump, etc. are all normal; whether the valve of the water cooling pipe has been opened, and whether the water cooling supply is normal;

Check whether the oil level of the expansion tank is correct, whether the liquid level sensor, etc. are normal;

Connect to the switching power supply of the control cabinet, check whether the voltage is normal, and check whether the indicator lights and display instruments are normal.

2. Operation method of machine equipment

Operate the heat transfer oil circulation pump, after starting the pump, all normal circulation will stabilize the pressure within 0.5 hours;

Press the heating operation button and observe whether the heating is normal;

Be sure to pay attention to the condition of the barometer during the initial operation.

3. Operation method of machine equipment shutdown

All normal shutdown: gradually reduce the temperature and stop heating. When the temperature of the heat transfer oil drops below 70°C, stop the operation of the heat transfer oil circulation pump; turn off the main switching power supply and make handover statistics.

Emergency shutdown: If the emergency shutdown occurs due to an emergency, the heating tube should be quickly turned off to facilitate the natural cooling of the thermal oil and avoid overheating.

4. FAQ

During the inspection, pay attention to check whether there is leakage around the gas mold temperature machine. The surrounding should be equipped with sufficient oil and electrical fire fighting equipment, and it is forbidden to use water as a fire extinguishing agent.

久久久久亚洲精品无码网址| 擦老太bbb擦bbb擦bbb擦| 怡红院AV一区二区三区| 亚洲日本一线产区和二线产区| 国产乱人伦精品一区二区在线观看| 国产白浆喷水在线视频| 国产漂亮白嫩美女在线观看| 久久综合综合久久综合| 青草青草久热精品视频在线观看| 久久久久亚洲AV无码专区导航| 瑜伽裤国产一区二区三区| 欧美精品高清在线观看| 久久国产精品二国产精品| 久久国产精品无码AV影视| 337p西西人体大胆瓣开下部| 免费a级毛片18禁网站免费| 国产亚洲婷婷香蕉久久精品| AV无码精品一区二区三区| 一区二区三区AV高清免费波多| 中文精品一卡2卡3卡4卡| 2021国产麻豆剧传媒在线| 亚洲高清国产拍精品熟女| 欧美日韩国产免费一区二区三区| 久久亚洲精品成人无码| 日本高清视频网站WWW| 成人国产一区二区精品| 亚洲国产精品一区二区制服| 免费无码成人AV片在线| 欧美极度丰满熟妇hd| 麻花传媒剧国产MV免费播放| 国产精品丝袜亚洲熟女| 亚洲精品综合在线影院| 亚洲熟妇自偷自拍另类| 欧美性猛交XXXX免费看蜜桃| 亚洲av区无码字幕中文色| 精品一区二区三区自拍图片区| 永久免费无码网站在线观看| 中文字幕AV无码不卡| 久久99热只有频精品6狠狠| 性生生活20分钟免费| 不卡无码人妻一区二区三区|