成品人视频ww入口,东北老富婆高潮大叫对白,99精品国产在热久久无毒不卡,一区二区三区内射美女毛片

News

Current Position: Home > News
What should I pay attention to before and after using the gas mold temperature machine?
announcer:

In industrial production temperature control equipment, the use of gas mold temperature machine is very common. It can be seen in the production of zinc alloy die casting, magnesium aluminum alloy die casting, rubber and plastic extrusion, and injection molding products. In addition to the advantages of relatively simple and convenient operation methods, most of the units are automatically operated. After only using the operation and setting the temperature, the operation method personnel do not need to re-unit, if the unit has a malfunction, there will be immediate Alarm reminder. But in addition to the old users who have already applied machinery and equipment, many customers are also exposed to this equipment at the beginning. They are very concerned about how to correctly apply the gas mold temperature machine, and what is the correct operation process?

 

1. Inspection before operation of gas mold temperature controller

Check whether the surrounding area is clean and free of debris, check whether the switching power supply, electric heater, control board, barometer, pump, etc. are all normal; whether the valve of the water cooling pipe has been opened, and whether the water cooling supply is normal;

Check whether the oil level of the expansion tank is correct, whether the liquid level sensor, etc. are normal;

Connect to the switching power supply of the control cabinet, check whether the voltage is normal, and check whether the indicator lights and display instruments are normal.

2. Operation method of machine equipment

Operate the heat transfer oil circulation pump, after starting the pump, all normal circulation will stabilize the pressure within 0.5 hours;

Press the heating operation button and observe whether the heating is normal;

Be sure to pay attention to the condition of the barometer during the initial operation.

3. Operation method of machine equipment shutdown

All normal shutdown: gradually reduce the temperature and stop heating. When the temperature of the heat transfer oil drops below 70°C, stop the operation of the heat transfer oil circulation pump; turn off the main switching power supply and make handover statistics.

Emergency shutdown: If the emergency shutdown occurs due to an emergency, the heating tube should be quickly turned off to facilitate the natural cooling of the thermal oil and avoid overheating.

4. FAQ

During the inspection, pay attention to check whether there is leakage around the gas mold temperature machine. The surrounding should be equipped with sufficient oil and electrical fire fighting equipment, and it is forbidden to use water as a fire extinguishing agent.

欧美激情一区二区久久久| 久久综合香蕉国产蜜臀AV| 光棍天堂免费观看在线观看| 国产女人AAA级久久久级| 精品一区二区无码AV| 国产免费破外女真实出血视频| 被黑人伦流澡到高潮HNP动漫| 亚洲AV永久无码精品国产精品| 色偷偷AV男人的天堂京东热| 精品无码人妻一区二区三区| 日欧精品卡2卡3卡4卡5卡| 国产午夜亚洲精品不卡下载| 亚洲AV成人片在线观看香蕉资源| 色综合视频一区二区三区44| 狠狠人妻久久久久久综合| 日本少妇人妻XXXXX18免费| 亚洲AV综合色区无码一二三区| 老女人老熟女亚洲| 久久超碰97人人做人人爱| 亚洲性色AV一区二区三区| 美女裸体无遮挡永久免费观看网站| 无码AV中文一区二区三区桃花岛| 久久久久久综合岛国免费观看| 白嫩少妇喷水正在播放| 日本怡春院一区二区三区| 免费人成在线观看网站品爱网| 熟妇人妻无码中文字幕老熟妇| 少妇高潮惨叫久久久久久电影| 久久久久国产精品无套专区| 亚洲国产一区二区a毛片| 国产精品黑色丝袜高跟鞋| 色综合天天综合网国产成人网| 婷婷精品视频在线观看| 午夜羞羞影院男女爽爽爽| 日韩欧美亚洲综合久久| 亚洲色AV性色在线观无码| 麻豆天美国产一区在线播放| 一个人免费视频观看在线WWW| 少妇人妻互换不带套| 婷婷久久综合九色综合97最多收藏| 国产精品国产三级国产AV麻豆|