成品人视频ww入口,东北老富婆高潮大叫对白,99精品国产在热久久无毒不卡,一区二区三区内射美女毛片

News

Current Position: Home > News
What should I pay attention to before and after using the gas mold temperature machine?
announcer:

In industrial production temperature control equipment, the use of gas mold temperature machine is very common. It can be seen in the production of zinc alloy die casting, magnesium aluminum alloy die casting, rubber and plastic extrusion, and injection molding products. In addition to the advantages of relatively simple and convenient operation methods, most of the units are automatically operated. After only using the operation and setting the temperature, the operation method personnel do not need to re-unit, if the unit has a malfunction, there will be immediate Alarm reminder. But in addition to the old users who have already applied machinery and equipment, many customers are also exposed to this equipment at the beginning. They are very concerned about how to correctly apply the gas mold temperature machine, and what is the correct operation process?

 

1. Inspection before operation of gas mold temperature controller

Check whether the surrounding area is clean and free of debris, check whether the switching power supply, electric heater, control board, barometer, pump, etc. are all normal; whether the valve of the water cooling pipe has been opened, and whether the water cooling supply is normal;

Check whether the oil level of the expansion tank is correct, whether the liquid level sensor, etc. are normal;

Connect to the switching power supply of the control cabinet, check whether the voltage is normal, and check whether the indicator lights and display instruments are normal.

2. Operation method of machine equipment

Operate the heat transfer oil circulation pump, after starting the pump, all normal circulation will stabilize the pressure within 0.5 hours;

Press the heating operation button and observe whether the heating is normal;

Be sure to pay attention to the condition of the barometer during the initial operation.

3. Operation method of machine equipment shutdown

All normal shutdown: gradually reduce the temperature and stop heating. When the temperature of the heat transfer oil drops below 70°C, stop the operation of the heat transfer oil circulation pump; turn off the main switching power supply and make handover statistics.

Emergency shutdown: If the emergency shutdown occurs due to an emergency, the heating tube should be quickly turned off to facilitate the natural cooling of the thermal oil and avoid overheating.

4. FAQ

During the inspection, pay attention to check whether there is leakage around the gas mold temperature machine. The surrounding should be equipped with sufficient oil and electrical fire fighting equipment, and it is forbidden to use water as a fire extinguishing agent.

国产亚洲精品精品精品| 我把寡妇日出水好爽| 男女啪啪无遮挡免费网站| 精品国产自在现线看久久| 国产色诱视频在线观看| 亚洲人成精品久久久久桥本| 成人国产经典视频在线观看| 丝袜美腿亚洲一区二区| 亚洲国产av一区二区三区| 69成人免费视频无码专区| 日韩人妻无码精品久久久不卡| 久久久久久亚洲精品无码| 久久精品国产亚洲av电影| 久久大香伊蕉在人线观看热VR| 国产成人高清精品免费| 国产最好看的级SUV卡毛| 亚洲AV无码一区二区三区天堂古代| 亚洲中文欧美日韩在线不卡| 人妻系列无码专区免费| 国产精品99无码一区二蜜桃| 国产精品无码久久综合网| 特级做A爰片毛片免费看108| 午夜理论片YY6080影院| 亚洲欧洲无码专区AV| 国产在线拍偷自揄拍无码| 国产精品国产免费无码专区不卡| 日韩人妻高清精品专区| 精品国产性色无码av网站| 欧美国产成人精品二区芒果视频| 饥渴的少妇2中文字幕| 国产精品国产三级国产AV中文| 国产精品VA尤物在线观看| 两个奶头被吃高潮视频| 亚洲爆乳AAA无码专区| 亚洲ⅴ国产v天堂a无码二区| 无码精品国产一区二区三区免费| 国精品人妻无码一区免费视频电影| 免费无码又爽又刺激高潮| 无码AV岛国片在线播放| 小SAO货水好多真紧H视频| 少妇被又大又粗又爽毛片久久黑人|